MASCOT / PROJECT CAPABILITIES & EXPERIENCE
Our EPCC scope covers the full palm oil and agriculture processing line — from fruit/material reception through to storage — plus the civil, structural and utility works that support it.
01
Receiving and storing Fresh Fruit Bunches (FFB) delivered from the plantation.
02
Steam sterilisation of FFB under pressure to soften bunches and loosen fruitlets.
03
Separating sterilised fruit from empty bunches using rotating cylindrical or shaftless thresher drums.
04
Digesting fruit into pulp and pressing to extract crude oil from sterilised fruitlets.
05
Breaking and conveying fibre and nut separately after the press station.
06
Recovering shell and kernel from the fruitlets for further processing.
07
Collecting and processing crude oil from the press station across multiple clarifying stages.
08
On-site electricity generation and steam generation for power and processing needs.
09
Treating raw water from the reservoir into clean, process-safe water.
10
Bulk storage of extracted crude palm oil ready for dispatch.
A sample of projects delivered across Malaysia, Indonesia and Papua New Guinea.
CLIENT | LOCATION | SCOPE |
|---|---|---|
Loders Croklaan Asia | Johor | Supply, construction & installation of storage tanks |
IOI Speciality Fats | Sabah | Civil, structural, mechanical, piping & insulation for 1,200T refining / 800T fractionation plant, plus bulk storage tanks |
Kirana Palm Oil Refinery (KLK Group) | Sarawak | Structural, mechanical & piping works; 1,500T & 4,500T storage tanks |
Felda Vegetable Oil Products | Pahang | Mechanical & structural steel works for fractionation plant; refinery/speciality fats contract |
Lahad Datu Edible Oils | Sabah | Supply, construction & installation of 1,500T / 3,000T / 5,000T storage tanks, equipment & piping |
IOI Bio-Energy | Sabah | Biomass-based cogeneration power plant |
Sepik Palm Oil Limited | Wewak, Papua New Guinea | Building structural works & mechanical works for palm oil mill |
Tanjung Manis Bulkers | Sarawak | CPO bulk storage tanks, piping & associated equipment |
Johor Plantations Group | Kluang | Replacement of empty bunch (EFB) conveyors at palm oil mill |
Bring us in at design stage for the most efficient scope.
Co. Reg. 41389-T · CIDB G7 · Est. 1978
Engineering strength. Construction excellence.
HEAD OFFICE
PLO 314/205, Jalan Perak Dua,
Pasir Gudang Industrial Estate,
81700 Pasir Gudang, Johor
+607 251 1887 · sales@mascot.com.my
© 2026 Mascot Engineering & Construction Sdn Bhd (41389-T)